Construction of highway bridge cross the river Amur in and around Blagoveshchensk (RF) — Heihe (PRC)

Project development and construction of the bridge cross the river Amur (2nd category two-lane bridge of cable-stayed system with low-profile bridge towers and the height of navigable passes of 147 rm). The length of highway bridge will make 956.54 m (Russian section – 300m), its width – 14.9 m. The roadway is dual, 2 pedestrian ways are provided. The height of span is 13.5 m.

The international project is scheduled for completion by December, 2016.

Project development: 2015

Construction: 2016

 

Строительство автодорожного моста через р. Амур в районе БлаговещенскСтроительство автодорожного моста через р. Амур в районе Благовещенск